3N93 Pre-run for October 18th
3N93 Pre-run Redux
——————————————————————————–
Duration: 8 hrs.
Event: 3N93 Trail Maintenance
Date: 10/10/2008
Hours (if this is a report): 36 total (Nick and Barb 22hrs) (Kurt, 14)
3N93 Pre-run
On Friday, October 10th, Nick and Barb (USMC0369) and myself (RAT) did a prerun inspection of 3N93 in preparation for the October 18th run, which is building up to be the biggest yet. We met up at the Ranger station, spoke with Greg Hoffman for a bit, during which Greg called in and confirmed that he will have a full size bulldozer at the West end of 3N93 for us Saturday. This is great news as this will make short work of the last two shelf areas needing extensive work. …read on…