Posted: 2N84, Reports by Sarah; 09-02-07 ()

Date: September 2, 2007

Attendees: Sarah (5), Rick (5), Brian (6), Chris (6), Tammy (6), Doug (6), Tracy (6), Julie (5), Jesse (5), Tori (5)

Hours: 55

This was the most interesting day on the trail yet. We met Brian, Chris & Tam, Julie, Jesse & Tori and Doug and Tracy at the Big Bear Ranger Station to grab some tools for the day ahead. It was a good thing Doug recommended meeting there too, because there was a mega yard sale going on in the triangle.

…read on…

BlackZZR’s Trail Patrol

Posted: 2N84, Reports by Sarah; 07-27-07 ()

Date: July 27, 2007

Attendees: BlackZZR & 2 friends

Hours: 4 ea / 12 hours

Ran up to the peak on Friday, July 27.
The bottom sign pointer has been bent around quite a bit, we straightened it out but it appears like someone tried to bend it back and forth to break it off and it twisted up a bit. The 2N84A trail up is in great shape.

2N84 Trail Patrol by FishPoet

Posted: 2N84, Reports by Sarah; 07-15-07 ()

Date: July 14-16

Attendees: Doug & Tracy

Hours: 8

Tracy and I spent the weekend at Yellow Post 5. We picked up all the trash within 100 yards of camp. On 2N84B we moved a downed tree that was blocking the trail. We hid 3 new geocaches. 1 each at the end of 2N84 and 2N84B and 1 not too far from YP5. …read on…

2N84 Trail Patrol by BlackZZR

Posted: 2N84, Reports by Sarah; 06-16-07 ()

Date: June 16

Attendees: 2 jeeps, 3 H3s and 3 FJs

Hours: 27.5

2n84 was in great shape this weekend. We ran to the top with 2 H3s, 2 jeeps, and 3 FJCs and once again were amazed at the views. …read on…

National Trails Day - June 2, 2007

Posted: 2N84, Reports by Russ; 06-02-07 ()

Date: June 2, 2007

Attendees: Russ (11)

Hours: 11

In observance of National Trails Day, I did some work on our Adopt-a-trail. Upon arrival, I ran to the end of 2N84B, then to the end of 2N84 and finally to the end of 2N84A. I didn’t see anyone; even the Yellow Post site was empty (unusual for this time of year). I spent the day digging some channels on 2N84A to channel rainwater and snowmelt away from the trail, and filling in some ruts.

Little Bear Peak Trail & Butler Peak Fire Lookout

Posted: 2N84, Reports by Sarah; 05-27-07 ()

Date: May 27, 2007

Attendees: Rick (5), Sarah (5), Brian (6), Mat (6), Tiff (6), Russ (6), Crash (5), Chris (5), Kathy (6), Beth (6), Crystal (5)

Hours: 61

Up for some Memorial Day weekend wheelin, Rick & Sarah, Crystal, Brian, Mat & Tiff, Russ, Crash & Chris, Kathy, and Beth all hit 2N84 around 11:30AM.

…read on…

Winter Trail Patrol

Posted: 2N84, Reports by nailer341; 01-20-07 ()

Date: Jan. 20, 2007

Attendees: Erik & Jeffrey

Hours: 32

Jeffrey and I, Erik, went up to check on our trails out there in big bear. The weather was great, and the trails were in fair shape. …read on…

2N84 Final Workday of ‘06

Posted: 2N84, Reports by Sarah; 11-05-06 ()

Date: November 4 & 5, 2006

Attendees: Saturday: Sarah 7.5, Rick 7.5; Tam 8; Chris 8; Tom 8; Cassidy 8; Katheryn 8; Jeff 10.25; John 10.75 = 76; Sunday: Kurt 6; Russ 10; Andrew Weber 11; Fernando & Kids 33 hrs

Hours: 136

We started Saturday morning and we cleared and trimmed trees and brush from 2N84B and 2N84A. Our previous projects including the culverts, sign installs and hill climb blocks are still standing strong. Did I mention we cleared some brush? We also visited the peak and our nonexistent geocache. Yes, folks, it’s been stolen…

…read on…

Big Bear Trails (1N04, 2N84, Holcomb)

Posted: 2N84, Reports by Rat Patrol; 10-29-06 ()

Date: 10/29/2006

Attendees: Kurt (Rat Patrol)

Hours: 6

I decided to go visit 2N84 (sort of a pre-run for next weekend) after an early morning fishing foray at the lake. …read on…

MJR Meet-N-Greet

Posted: 2N84, Reports by Sarah; 08-18-06 ()

Date: August 16, 2006

Attendees: Sarah: 5.5, Rick: 5.5, Bryan: 6, Brian: 7.5, Jason + Kids: 22.5, Mark: 6, Crash: 5.5, Chris: 5.5

Hours: 64

We started the day at Hanna Flat and headed to our Adopt-A-Trail, 2N84. The culverts have held up well throughout the summer but there are a few places where brush should be trimmed. Next time we’ll arrange for trimmers. Our “illegal trail” blockages have held up and there was little-to-no trash on the trail. The Yellow Post site is in excellent condition. …read on…